Pump motor protection: voltage, overload and dry run
Farm pump motors burn out from low voltage, overloads and running dry, and rewinding costs thousands. A protection unit that checks voltage and current and trips the motor before damage saves farmers money.
- Parts
- ₹3,425
- Build
- 12 weeks
- Board
- Arduino Uno
- Objectives
- 6
Block diagram
- Voltage sensorChecks under and over voltage
- CT sensorMeasures motor current
- Arduino UnoRuns the protection logic
- Relay to contactor coilTrips the motor
- LCD and buzzerShow the fault
- 4G modemSends SMS alerts and calls over the mobile network+
- Cloud dashboardStores readings, plots trends and sends alerts+
Objectives
- To measure supply voltage and motor current as true RMS.
- To trip on under voltage (below 180 V) and over voltage (above 260 V) after a delay.
- To trip on overload with an inverse-time curve, and on dry run (current below 60% of normal).
- To restart automatically after voltage recovers, with a set delay.
- To send SMS alerts through a 4G modem where no Wi-Fi is available.
- To publish readings over MQTT and show them on a live dashboard with threshold alerts.
Parts and specifications
- Arduino Uno R3 (CH340 clone)ATmega328P 16 MHz, 32 KB flash, 2 KB SRAM, 5 V logic, 6 analog inputs (10-bit), 6 PWM pins₹450Buy
- ZMPT101B AC voltage sensorIsolating voltage transformer up to 250 V AC, analog output centred at VCC/2, trimmer for gain₹180Buy
- SCT-013-030 split-core CT0 to 30 A AC to 0 to 1 V AC (built-in burden), clamp on without breaking the wire₹450Buy
- 5 V relay module (1 channel)10 A 250 V AC contacts, coil 70 to 80 mA, optocoupled input; many trigger at 3.3 V, check yours₹70Buy
- 16×2 LCD with I²C backpackHD44780, PCF8574 at 0x27 or 0x3F, 5 V, contrast trimmer on the back₹220Buy
- Small single-phase motor or fan as the test load₹0
- Closed box, fuse and MCB₹450
- A7670C 4G LTE module4G Cat-1 with 2G fallback, SMS, calls and data, works with any Indian SIM including Jio; 3.4 to 4.2 V, 2 A peaks₹1,500Buy
- LM2596 buck converter (set to 4.0 V for the modem)4 to 40 V in, 1.25 to 37 V out, up to 2 A continuous (3 A peak), about 85% efficient₹90Buy
Total about ₹3,425 at typical online prices. Tap a part for its pinout and datasheet notes.
Design calculations
Trip below 180 V or above 260 V for more than 5 s (to ride through brief dips); restart when 195 to 250 V holds for 2 minutes.
Trip time t = k / ((I/In)² − 1). With k = 60 s: 1.5 × In trips in 48 s, 2 × In in 20 s, 6 × In (locked rotor) in under 2 s.
A pump running dry draws much less current. Learn normal current over the first 2 minutes; trip if it falls below 60% of that for 10 s.
Wait 2 minutes after a trip so the water column settles and the motor cools before restarting.
Pin map
| Signal | Pin or connection |
|---|---|
| ZMPT101B OUT | A0 |
| SCT-013 (biased 2.5 V) | A1 |
| Relay to contactor coil | D7 |
| Buzzer | D8 |
| LCD | A4 / A5 |
| Reset button | D2 |
Firmware outline
- Sample voltage and current at 2 kHz, compute RMS every 200 ms.
- Check under/over voltage timers.
- Integrate overload heat: add (I/In)² − 1 each tick, trip when the total reaches k.
- Detect dry run against learned normal current.
- On trip, open the relay, show the cause and log it; restart after the delay if the cause is gone (not after overload, which needs a manual reset).
Test plan
| Test | Expected result |
|---|---|
| Voltage lowered with a variac (guide present) | Trips below 180 V after 5 s |
| Motor shaft loaded | Overload trip time matches the curve |
| Fan with blades removed (light load) | Dry-run trip |
| Voltage restored | Auto restart after 2 minutes |
These rows start your results table when you plan the project.
Viva practice
Say your answer out loud first, then check. The first 2 answers are free; Maker opens all 5.
Make it yours
One or two upgrades for a mini project, two to four for a major one.
Datasheets and sources to cite
- IS/IEC 60947-4-1 (contactors and motor starters)
- IS 8034 (submersible pumpsets)
- YHDC SCT-013 datasheet
About this project
How much does the pump motor protection: voltage, overload and dry run project cost?
About ₹1,835 for the parts in the base list: Arduino Uno R3 (CH340 clone), ZMPT101B AC voltage sensor, SCT-013-030 split-core CT, 5 V relay module (1 channel), 16×2 LCD with I²C backpack, Active buzzer 5 V, Small single-phase motor or fan as the test load, Closed box, fuse and MCB.
How long does it take?
About 8 weeks for the base project, built on an Arduino Uno. Each upgrade adds time.
Which branches is it suitable for?
Electrical and Electronics, Instrumentation, Diploma (any electronics branch), as a mini or major project.
Which pins and design calculations does it use?
ZMPT101B OUT on A0; SCT-013 (biased 2.5 V) on A1; Relay to contactor coil on D7. Worked calculations on this page: voltage limits, inverse-time overload, dry run, restart delay.
How do I test it?
Voltage lowered with a variac (guide present): Trips below 180 V after 5 s. Motor shaft loaded: Overload trip time matches the curve. Fan with blades removed (light load): Dry-run trip. Voltage restored: Auto restart after 2 minutes.
What are the objectives?
To measure supply voltage and motor current as true RMS. To trip on under voltage (below 180 V) and over voltage (above 260 V) after a delay. To trip on overload with an inverse-time curve, and on dry run (current below 60% of normal). To restart automatically after voltage recovers, with a set delay.